The Delta Center needed a more wind resistant roof system designed. Installation without interfering with scheduled events was imperative. Clark's needed to keep the existing tornado damaged roof in a watertight condition while the replacement roof was being completed.
| Building Owner: | Larry H Miller Group |
| General Contractor: | Sahara Construction |
| Manufacturer: | Sarnafil Roofing Systems |
| Roof Area: | 175,000 sq. ft. |
| Project Completed: | November, 1999 |
| System: | Fully Adhered |
| Membrane | G410, 48 Mil |
Clark's Quality Roofing worked with Sahara Construction,
the Larry H. Miller Group, and Sarnafil to design and install a proven wind resistant roof that would comply with the stringent design specifications required by Factory Mutual Insurance Company.
During the design phase Clark's Quality Roofing performed major repairs to enable the continued use of the building. During the installation of the new roof, Clark's was on call 24 hours a day, 7 days a week, to continue repairing the heavily damaged existing roof as needed throughout the entire project.
As they were prohibited from working during events, Clark's Quality Roofing worked many weekends and evenings to accommodate the schedule of the Delta Center and still meet the tight completion deadline. Constant communication and coordination with Sahara Construction enabled Clark's Quality Roofing to replace the roof with no interruptions to scheduled events.